Most custom cabinet projects take about 6–8 weeks from the day you approve the final design to the day your cabinets are ready to install. Smaller projects can be faster; larger projects and special finishes take longer. Here is what happens at each stage and what you can do to keep things moving.
1. Free consultation
We meet at our Boynton Beach showroom or in your home to talk about your space, how you use it, your style and your budget. Bring photos, measurements or plans if you have them.
2. Measuring and 3D design
We measure the room and design the layout in 3D, so you see your cabinets before anything is built. Choosing your door style and finish from real samples in the showroom helps you decide faster.
3. Building in our shop: about 6–8 weeks
Once you approve the design, your cabinets are built to measure in our Boynton Beach shop, with 3/4-inch maple or birch plywood boxes and soft-close hardware. This is the longest step, and its length depends on the size of the project and the finishes you chose.
4. Installation by our team
Our own team installs everything we build. How long installation takes depends on the size of the project; we confirm it when we schedule your job. Countertops are usually templated once the cabinets are in place, so plan that step with your countertop supplier.
What can change the timeline
- Design changes after you approve the final design
- Special finishes or materials
- Site readiness: demolition, plumbing and electrical work should be finished before installation day
- Condo or HOA rules for deliveries and work hours
Have a date in mind?
If you are planning around a move, a holiday or a family event, tell us at the consultation and we will plan the schedule around it. See custom kitchens, closets and vanities for what we build.